Auvere, Ida-Virumaa

Construction of the chimney foundation.

Concrete volume 1000 m3.

Construction of the building with power generation plant control points.

Concrete volume 2200 m3.

Construction of foundations for the pipeline route.

Concrete volume 800 m3.